Steel framing is a structure of cold-formed galvanised steel profiles, engineered piece by piece, onto which the envelope is built up in layers. It is not a prefab house and it is not a temporary system: it is a real structure, calculated exactly like a concrete one, and in countries such as the United States, Japan and Australia it has been the normal way of building homes for decades.
The difference with brickwork is not strength, it is process. This is dry construction: no water, no mortar, no curing times. The profiles arrive cut to size and are screwed together, so tolerances are measured in millimetres and the build moves at a pace wet trades cannot match. And its self-weight is a fraction of a traditional structure, which opens the door to building on top of what is already there.
At Grupo Construcciones Alicante we build with steel framing across Alicante and the province: complete detached homes, extensions and roof-level additions on existing buildings, mezzanines in units and warehouses, and low-weight façade systems. If what you need is partitions, linings or board ceilings, we cover that on our plasterboard in Alicante page.
We call you back and come to see it. Reply the same working day and, depending on the job, a quote within 24 hours.
🔒 No obligation. We never share your details.
The first advantage is weight. A galvanised steel structure weighs around seven times less than an equivalent concrete one, and that is decisive for the use we see most here: building on top of what already exists. Adding a floor, adding a wing or fitting a mezzanine in a unit are jobs that in many cases simply do not work in traditional construction because the existing structure will not take the load, and with steel framing they do.
The second is time. A home in steel framing is built in 6 to 8 months, against the 10 to 12 months of an equivalent traditional build. There are no setting or curing times, and once the envelope is closed the work carries on under cover, so rain stops halting the site. Those months are not just convenience, they are money that does not go on rent while you wait, on security, and on developer mortgage interest.
The third, and in Alicante perhaps the most valuable, is insulation. The insulation and all the services fit inside the framing without cutting a single chase, and the system takes continuous external insulation and rock wool inside. With the summers we get here, the difference in comfort between a properly resolved envelope and a traditional façade with no continuity of insulation shows up on the bill every single month.
Steel framing requires decisions to be made early and precisely: the profiles come cut from the factory and there is no improvising on site. This is the process:
Complete home in steel framing. A galvanised steel profile structure for a whole detached house, engineered and built to the same standard as any structure. It is the option that is growing fastest on plots where the programme matters and where a very well insulated envelope is wanted without a disproportionate premium.
Extensions and roof-level additions. This is where the system wins outright: adding a floor on top of what exists, or a new wing, without overloading the current structure. It needs structural calculation and planning permission like any extension, plus a check that what is underneath will take it. With that done, assembly is quick, very clean and compatible with the building staying in use.
Mezzanines and upper floors. In commercial units and warehouses, gaining a floor without loading the slab or raising masonry columns. It is engineered, assembled in days, and lets the business keep trading through much of the work.
Envelope and façade. Cement board with continuous external insulation resolves very low-weight façades with excellent thermal behaviour. Combined with a ventilated façade, it is the best answer we know to the Alicante summer.
What it costs. The reference price for a home in steel framing is €1,800 per m² of construction cost, meaning the house from the foundations upwards: around €180,000 for 100 m². Adding foundations, professional fees, permits and taxes, between 25% and 35% more, the real turnkey cost lands between €225,000 and €245,000, with the plot as a separate cost. For mezzanines and extensions the budget is worked out per project after the site visit.
That price per m² does not include foundations and earthworks, which depend strictly on the ground and add between €15,000 and €30,000 when the soil is soft or sloping; municipal taxes and fees, with VAT at 10% for self-build plus the local construction tax and the building permit, around 14-15% of the total; professional fees for the geotechnical and topographic surveys, the project and site management, between 10% and 12%; the water, electricity, gas and sewage connections, depending on the distance to the mains; nor the external works, with fencing, pavements, vehicle access and the garden.
The old prejudice is that a house of steel and board is somehow less of a house. It is not, and the difference lies in the execution. Galvanised steel meets the Spanish building code on strength, fire behaviour and insulation, it does not rot, it is not attacked by pests or damp, and it does not suffer the movement that cracks partitions in a poorly cured wet build. What makes the difference are the details you cannot see: continuity of the vapour barrier, how thermal bridges are resolved at junctions, and the reinforcements planned inside the framing where the weight will later go.
On hanging things, which is the first question we always get: with the right stud and a planned reinforcement, a steel framing wall takes tall units, large televisions and wall-hung sanitaryware without argument. The key is telling us before the boards go on, because fitting a reinforcement during assembly costs practically nothing and solving it afterwards means opening up.
On acoustics, a well-built steel framing envelope performs as well as or better than a traditional one of the same thickness, because the mass-spring-mass principle works very well against airborne noise. What ruins the result are acoustic bridges: back-to-back socket boxes, unsealed junctions at the perimeter, or a resilient strip that never got fitted. Cheap details that separate a proper job from one that causes trouble.
Where we do not recommend it: in walls that must carry structural load without prior calculation, and in areas of constant impact without specific reinforcement. For everything else, and very especially for building on top of what already exists, it is almost always the best option today.
Light gauge steel work we do regularly across Alicante and the province:
Yes, and it is one of its best applications: adding a floor on top of what exists, or a new wing, without overloading the current structure. It needs structural calculation and planning permission like any extension, and the existing structure has to be checked for the added load, which is light but real. That check is the first thing we do and it is what decides whether the project works at all. With it done, assembly is fast, very clean and compatible with continuing to live or trade in the building.
Yes, and better in some respects. Cold-formed galvanised steel is calculated profile by profile and meets the Spanish building code on strength, seismic behaviour, thermal performance and fire. It weighs around seven times less than concrete but is stiff enough, it does not rot, it is not attacked by pests or damp, and it does not show the movement that cracks wet construction. Galvanising is what gives it its service life, which is why the detail that matters is not the steel itself but making sure there is no condensation inside the framing: that is where durability is won or lost, and that is what separates a proper job from a cheap one.
The reference price is €1,800 per m² of construction cost, which is the house from the foundations upwards: around €180,000 for a 100 m² home. On top of that you add between 25% and 35% for foundations, professional fees, permits and taxes, which puts the real turnkey cost between €225,000 and €245,000. The plot is separate and is not included in any of those figures. For extensions and mezzanines the budget depends so much on what is underneath that it only makes sense to quote after the visit.
A home in steel framing is built in 6 to 8 months, against the 10 to 12 months of an equivalent traditional build. The structure itself goes up in weeks, and from the moment the envelope is closed the work is under cover, so rain stops running the calendar. What does not get shorter is the administrative side: the project, the permit and the paperwork take what they take, and they are worth counting separately when planning.
Better than a poorly resolved traditional façade, yes. The system allows continuous external insulation, without the thermal bridges at slab edges and columns, and takes rock wool inside the framing. Combined with a ventilated façade, which is what we usually propose on the coast, thermal mass stops being the issue because the radiation never reaches the inner leaf. In an Alicante summer that difference shows up in the air conditioning bill from the first month.
Yes. In wet interiors we use moisture-resistant board or, better, cement board where there is direct contact with water, such as inside a shower; that substrate is then tanked and tiled as normal. On the coast, what needs care is the salt-laden air: it is resolved with the right galvanising specification on the profiles and a ventilated external envelope that does not trap moisture. It is a design decision, not something added later, which is why we take it before ordering material.